Physics Electronics PMDC Conceptual Practice
PMDC Verified Question 243 of 494
In the space-charge depletion region of an isolated PN junction at equilibrium, what are the net static charge polarities on the N-side and P-side of the metallurgical interface?
A
Negative on the N-side and positive on the P-side
B
Positive on both sides
C
Negative on both sides
D
Positive on the N-side and negative on the P-side
Tap any option to test your recall and reveal the step-by-step Propolis autopsy.

Propolis Cognitive Error Autopsy

Official Correct Choice:
Option D: Positive on the N-side and negative on the P-side
Concept:

Diffusion of mobile carriers across the junction exposes uncompensated donor ions (positive) on the N-side and uncompensated acceptor ions (negative) on the P-side.

Formula:

$$\text{N-side Space Charge: } +q N_D \quad | \quad \text{P-side Space Charge: } -q N_A$$

Solution:

  • Free electrons diffuse from the N-side into the P-side, leaving behind fixed, ionized positive donor atoms (\( N_D^+ \)).


  • Holes diffuse from the P-side into the N-side, leaving behind fixed, ionized negative acceptor atoms (\( N_A^- \)).


  • Thus, the depletion layer carries net positive charge on the N-side and net negative charge on the P-side.


Why other options are incorrect:

  • Option A: This reverses the space-charge polarity across the junction.
  • Option B: Positive charge on both sides would violate overall crystal electrical neutrality.
  • Option C: Negative charge on both sides would violate charge neutrality.

Quality & Fidelity Assurance: Every question on BeambePrep is rigorously curated against the official PMDC syllabus with zero filler, zero out-of-syllabus content, and zero typos. When an authentic past paper originally contained a historical mistake or ambiguity from the examining board (such as UHS or NUMS), BeambePrep faithfully reflects the original paper while detailing the nuance and scientific consensus in the autopsy above.

Want to solve full-length papers under timed exam conditions?

Practice with zero-scroll lockdown sprints, dynamic latency zone timers, live peer selection telemetry, and the automated Amber mistake recovery loop.